{
 "about": {
  "source": "https://evtolemirates.com/entities.json",
  "page": "https://evtolemirates.com/vertiports/al-bateen-vertiport.html",
  "license": "CC BY 4.0 — https://creativecommons.org/licenses/by/4.0/",
  "attribution": "evtolemirates.com"
 },
 "entity": {
  "slug": "al-bateen-vertiport",
  "entity_type": "vertiport",
  "country": "UAE",
  "city": "Abu Dhabi",
  "status": "under_construction",
  "last_verified": "2026-08-22",
  "name": "Al Bateen Executive Airport (AZI) Vertiport",
  "meta_description": "Al Bateen Executive Airport (AZI) Vertiport is under construction as the second foundational node of Abu Dhabi's 10-vertiport network. Site of Archer Midnight's first Abu Dhabi flight on 2 July 2025.",
  "latitude": 24.4283,
  "longitude": 54.4581,
  "sources": [
   {
    "id": "adio-2025-11-10",
    "name": "Abu Dhabi 10-Vertiport Network Announcement — Integrated Transport Centre / ADIO / Abu Dhabi Airports / GCAA (10 Nov 2025)",
    "url": "https://www.thenationalnews.com/business/aviation/2025/11/11/abu-dhabi-to-build-10-vertiports-for-air-taxis/",
    "type": "government",
    "accessed": "2026-05-20"
   },
   {
    "id": "archer-ir-2025-04-23",
    "name": "Archer Aviation IR — Archer Secures Design Approval For UAE's First Hybrid Heliport (23 Apr 2025)",
    "url": "https://investors.archer.com/news/news-details/2025/Archer-Secures-Design-Approval-For-UAEs-First-Hybrid-Heliport-Paving-The-Way-For-Commercial-Air-Taxi-Service-In-Abu-Dhabi/default.aspx",
    "type": "operator-ir",
    "accessed": "2026-05-20"
   },
   {
    "id": "gcaa-2025-11-03",
    "name": "GCAA UAE — Air-taxi certification target Q3 2026 (Saif Mohammed Al Suwaidi, 3 Nov 2025)",
    "url": "https://www.thenationalnews.com/business/aviation/2025/11/03/uae-air-taxi-certification-to-be-completed-by-third-quarter-of-next-year-regulator-says/",
    "type": "regulatory",
    "accessed": "2026-05-20"
   }
  ],
  "i18n": {
   "en": {
    "name": "Al Bateen Executive Airport (AZI) Vertiport",
    "meta_description": "Al Bateen Executive Airport (AZI) Vertiport is under construction as the second foundational node of Abu Dhabi's 10-vertiport network. Site of Archer Midnight's first Abu Dhabi flight on 2 July 2025."
   },
   "ar": {
    "name": "Al Bateen Executive Airport (AZI) Vertiport",
    "meta_description": "Al Bateen Executive Airport (AZI) Vertiport is under construction as the second foundational node of Abu Dhabi's 10-vertiport network. Site of Archer Midnight's first Abu Dhabi flight on 2 July 2025."
   },
   "fr": {
    "name": "Al Bateen Executive Airport (AZI) Vertiport",
    "meta_description": "Al Bateen Executive Airport (AZI) Vertiport is under construction as the second foundational node of Abu Dhabi's 10-vertiport network. Site of Archer Midnight's first Abu Dhabi flight on 2 July 2025."
   },
   "de": {
    "name": "Al Bateen Executive Airport (AZI) Vertiport",
    "meta_description": "Al Bateen Executive Airport (AZI) Vertiport is under construction as the second foundational node of Abu Dhabi's 10-vertiport network. Site of Archer Midnight's first Abu Dhabi flight on 2 July 2025."
   },
   "zh": {
    "name": "Al Bateen Executive Airport (AZI) Vertiport",
    "meta_description": "Al Bateen Executive Airport (AZI) Vertiport is under construction as the second foundational node of Abu Dhabi's 10-vertiport network. Site of Archer Midnight's first Abu Dhabi flight on 2 July 2025."
   }
  },
  "facts": [
   {
    "id": "type",
    "k": "Type",
    "v": "Vertiport",
    "i18n": {
     "ar": {
      "k": "النوع"
     },
     "de": {
      "k": "Typ"
     },
     "zh": {
      "k": "类型"
     }
    }
   },
   {
    "id": "operator",
    "k": "Operator",
    "v": "Abu Dhabi Aviation (under Archer agreement)",
    "i18n": {
     "ar": {
      "k": "المشغّل",
      "v": "Abu Dhabi Aviation (بموجب اتفاق Archer)"
     },
     "fr": {
      "k": "Exploitant",
      "v": "Abu Dhabi Aviation (selon l'accord Archer)"
     },
     "de": {
      "k": "Betreiber"
     },
     "zh": {
      "k": "运营方",
      "v": "Abu Dhabi Aviation（根据 Archer 协议）"
     }
    }
   },
   {
    "id": "builder",
    "k": "Builder",
    "v": "Skyports Infrastructure",
    "i18n": {
     "ar": {
      "k": "جهة الإنشاء"
     },
     "fr": {
      "k": "Constructeur"
     },
     "de": {
      "k": "Errichter"
     },
     "zh": {
      "k": "建造方"
     }
    }
   },
   {
    "id": "regulator",
    "k": "Regulator",
    "v": "GCAA (UAE) + Integrated Transport Centre (Abu Dhabi)",
    "i18n": {
     "ar": {
      "k": "الجهة التنظيمية",
      "v": "GCAA (الإمارات) + مركز النقل المتكامل (Abu Dhabi)"
     },
     "fr": {
      "k": "Régulateur",
      "v": "GCAA (EAU) + Centre de Transport Intégré (Abu Dhabi)"
     },
     "de": {
      "k": "Aufsichtsbehörde"
     },
     "zh": {
      "k": "监管机构",
      "v": "GCAA（阿联酋）+ 综合交通中心（阿布扎比）"
     }
    }
   },
   {
    "id": "aircraft",
    "k": "Aircraft",
    "v": "Archer Midnight",
    "i18n": {
     "ar": {
      "k": "الطائرة"
     },
     "fr": {
      "k": "Aéronef"
     },
     "de": {
      "k": "Luftfahrzeug"
     },
     "zh": {
      "k": "飞行器"
     }
    }
   },
   {
    "id": "status",
    "k": "Status",
    "v": "Under construction; Q1 2026 completion projected (now slipped); flight-tested 2 Jul 2025",
    "i18n": {
     "ar": {
      "k": "الحالة",
      "v": "تحت الإنشاء؛ إنجاز متوقع في Q1 2026 (الآن تأخر)؛ تم اختباره برحلة في 2 يوليو 2025"
     },
     "fr": {
      "k": "Statut",
      "v": "En construction ; achèvement Q1 2026 projeté (maintenant glissé) ; essai en vol 2 juillet 2025"
     },
     "de": {
      "v": "Unter Konstruktion; Q1 2026 Fertigungsziel projiziert (jetzt verschoben); Flugerprobung 2. Juli 2025"
     },
     "zh": {
      "k": "状态",
      "v": "建设中；预计 Q1 2026 完成（现已推迟）；2025年7月2日飞行测试"
     }
    }
   }
  ]
 }
}